CBS Studios, Studio City, CA

Santa Monica Place Remodel & Addition, Santa Monica, CA
April 1, 2015
Skirball Cultural Center
April 1, 2015

CBS Studios, Studio City, CA

CBS Studios, Studio City, CA
Davidovich & Associates was retained by the facility after the 1994 Northridge Earthquake to access the earthquake damages and evaluate, design and supervise the necessary repairs. Davidovich & Associates designed broadcasting space, film storage, satellite dishes, maintenance shops, several new offices, remodeled existing spaces, including sound stages, post production offices, code required modifications, etc.

 

Other notable projects:

Las Vegas Hilton, Las Vegas, NV
Laser Show Fountain for the Flamingo hotel. This project was the first light and water show in Las Vega. Unfortunately, after completion of the construction, the show was closed due to the fact that the laser beam was too strong and disctraction airplane pilots, and the FAA requested to close the show. Davidovich & Associates was responsible for all MEP aspects of the project including sophisticated digital controls for plumbing and electrical lighting equipment, water distribution, coordination with structural and civil trades.

Digital Theatre Systems, Inc. (DTS Digital Sound), Agoura Hills, CA
New Headquarters including Offices, Mastering Rooms and 50-seat Theatre, Agoura Hills.

Los Angeles Unified School District, Los Angeles, CA
Design of 14,000 s/f of tenant improvements for LAUSD located at the Baldwin Hills Theater Building

Musician Institute, Los Angeles, CA
Historic renovation of the Old Max Factor Building

Warner Brothers Studios, Burbank, CA
Renovation of Building 6, 25,000 s/f – Dubbing Stage 5 and 8 and Scoring Stage 1 and 2.